Every walkway includes excavation to proper depth, compacted gravel base, drainage considerations, and edge restraints installed to manufacturer specifications. We use materials from Cambridge, Techo-Bloc, Unilock, Nicolock, Eldorado, and Boral.
In Northwest Harbor, we account for the peninsula location and coastal conditions. Sandy soil drains well but needs proper compaction. We plan for water runoff toward Gardiners Bay and away from your foundation.
Your walkway gets built to handle the specific challenges of Long Island’s climate – the freeze-thaw cycles, the moisture from being near the water, and the soil movement that comes with coastal living. Most installations require minimal maintenance beyond joint sand replenishment every 3-5 years.